1. Identify key production planning considerations (which, when and how much(prenominal) of each to produce, methods of dealing with short/long term changes in capacity demand).
Jos. A. Banks utilizes a batch flow process which makes the concern for materials routing much less particular than in a trouble shop. The flow of materials through the process is fairly smooth and good directed. The production schedule is typically laid out in an 8 week period consisting of the 1 week sacred to planning, the next 2 weeks consecrate to cutting, and the remaining 5 weeks dedicated to the shop. Jos. A. Banks utilized unionized workers in their manufacturing facilities who were paid incentive wages, although incentives alter across departments.
Identify authorisation bottlenecks (use process flow draw in text) and discuss possible methods of breaking them.
Material shortages are a main potential bottleneck that could arise. To prevent this 10% extra of piece goods were typically ordered to give the telephoner flexibility if demand exceeded the forecast. Having an excess of material was not an fall out because Jos. A. Banks fashions changed minimally year to year so any redundancy material could be used the following year.

Another potential bottleneck is the layout of the facility. Jos. A. Banks layout provided for a steady flow of goods through the factory. They had critical key matching stations which helped control the flow of move through the process and uncover any shortages.
Point out any special considerations, which should be accorded to managing the workforce.
The majority of the Jos. A. Banks workforce already had years of experience in the apparel industry, the workers who did not authorized considerable training. Also, once a new operator was a assigned a job, it was likely that he or she stayed at that same job through retirement, with only 10%...If you privation to get a full essay, order it on our website: Orderessay
If you want to get a full essay, wisit our page: write my essay .